Before installing the anti-vibration bracket , the construction unit shall prepare a construction plan according to the construction drawings and requirements, and submit it to the supervision unit for review. Installers must undergo pre-job training. Only after qualified training can they start their jobs. Structural materials, specifications and performance should meet the design requirements of anti-vibration brackets and hangers. During the hoisting or transportation of earthquake supports, corresponding protective measures should be taken to prevent accidents.
In addition to the relevant provisions of the current industry standard GJ80, "Technical Specification for Construction at Heights" JGJ33 and "Technical Specification for Temporary Use of Electricity at Construction Site" JGJ46, the construction measures of anti-vibration brackets and hangers should also meet the requirements of construction organization design. .
Prepare to install anti-vibration bracket .
After the products are delivered to the site, the anti-vibration brackets and hangers shall be inspected and accepted on site. The supplier must provide the factory certificate, parts and parts inspection report: After the product enters the site, the personnel of the supervision (construction) unit shall conduct classified and sample inspections of the construction unit according to the product inspection standards.
The storage of shock-proof frame products should meet the following requirements:
1. It should be stored in a well-ventilated and dry storage room.
2. Components with the same model and specifications that should be stored on the shelf: When placed on the pallet, they should be arranged neatly, and the height should not exceed 5 layers or 1 meter.
3. For storage of channel steel, a layer of moisture-proof film should be laid on the ground, and a layer of moisture-proof film should be dried.
Plates (or wooden frames, bamboo plywood, etc.), different types of plates should be stacked separately; dry plates should be placed between unopened plates.
4. The height of the channel steel should not exceed 1.0m. There should be anti-tilting measures and warning signs.
Cutting C-slots and full-threaded booms. The following requirements should be met:
1. The verticality of the section should be ensured when cutting;
2. When cutting C-slots, the opening faces down, and deformation should be avoided when cutting;
3. The burrs of the cutting head should be polished and smooth, and the adsorbed iron filings and powder should be removed in time:
4. Protective measures should be taken at the cut section.
In addition, the construction equipment should be complete, and the measuring tools should have inspection certificates and be used within the corresponding good period. Before installing the anti-vibration bracket , the construction scope should be clarified, and the relevant working surface should meet the technical requirements for construction and the installation of the anti-vibration bracket.
Contact us
Address: Area C, 2nd Floor, No. 55, Guigu 6th Road, Luoxing Street, Jiashan County, Jiaxing City, Zhejiang Province
Mobile: 18057338555 Phone: 0573-84022966
E-mail: symboan@symboan.com
7x24-hour service hotline:
400-926-6616